Ironman Work Party - Clearing to 700yds (PENDING BOD APPROVAL)

Stephen Hurst, Match Director for PRS Rimfie and PRS, is coordinating a work party to help clear the area leading to the rear of Ironman so steel targets can again be easily placed. A special "Signup" page has been created to add your name to the work party:

More information will be added as this matures, but be prepared to help clear the UTV roadway (right side of the range) from the Ironman 450yd line back and up the rise to the 700yd line. 

  • Long pants /  sleeved shirts or coveralls highly suggested - bugs, ticks and prickly growth.
  • PPE - Work gloves and eye and ear protection
  • Gas or battery powered chain saws
  • Gas powered weed eater with a brush blade
  • Any battery powered branch and brush cutters
  • Any gas or battery powered pole saws
  • Manual loppers and branch cutters to help cut back the overgrowth
  • Anything else that might help cut back the brush overgrowth

Special request - Anyone have a walk behind bush / brush hog? Could be used to clear a path directly from the 450yd line, and on a straight line, back to the path that leads up to the 700yd line.

Contact Stephen Hurst with questions or to assist at hurst96mcv@gmail.com

 

Event Date(s): 

Sun, 06/29/2025 - 08:00 to 12:00